S008 - PIA Overhead Cable Installation

The accreditation covers the engineering techniques used to deploy drop cable up to a maximum diameter of 7mm within the Openreach Overhead infrastructure safely. It also covers the agreed network quality standards associated with PIA (Physical Infrastructure Access) CP (Communication Provider) cable deployment. The accreditation consists of a questionnaire and practical assessment.

Description

This module assesses the delegate's knowledge and ability to install a CP overhead cable in line with current PIA terms and conditions. A minimum of 5 poles and associated overhead cabling shall be assessed for suitable deployment of CP cables and/or apparatus.

Prerequisites

  • SA001 - Overhead Safety or equivalent
  • NRSWA Streetworks Qualification - Unit 01

PPE

Mandatory PPE - Please note without the correct PPE candidates could be refused onto the event and charges will still apply.

Hi-Vis Clothing
Safety Boots (with defined heel)
Safety Helmet (with 4 point chin strap)
Gloves
Eye shields

Desirable PPE
Harness
Working Belt
Lanyard

Similar courses

The module assesses the delegate's knowledge and ability to increase space in the upper pole envelope by moving the top bass step downwards in line with the current PIA terms and conditions and also to understand the new upper envelope of space and its measurement.

More Information

This accreditation covers 3 modules, Module 1 training designed to develop the delegates knowledge of the Openreach Overhead Infrastructure. Module 2 equips the delegates with the necessary skills to undertake a safe PIA (Physical Infrastructure Access) Pole Survey. Module 3 accreditation access the delegates knowledge by demonstrating the competency required to complete an effective PIA Pole Survey.

More Information

This accreditation covers 3 modules, Module 1 training designed to develop the delegates knowledge of the Openreach Underground Infrastructure. Module 2 equips the delegates with the necessary skills to undertake a safe PIA (Physical Infrastructure Access) Duct Survey. Module 3 accreditation access the delegates knowledge by demonstrating the competency required to complete an effective PIA Duct Survey.

More Information

The accreditation covers the engineering techniques used to deploy cable and Sub Duct up to a maximum diameter of 25mm within the Openreach underground infrastructure safely. It also covers the agreed network quality standards associated with PIA (Physical Infrastructure Access) CP (Communication Provider) cable deployment. The accreditation consists of a questionnaire and practical assessment.

More Information